PROJECT SUPPLY
Smart lock solutions, organised by buyer type rather than by product range. A brand owner needs a product that is genuinely theirs. A door manufacturer needs a lock that fits without rework. A project needs unit 1 and unit 2,000 to be the same unit.
Platform
Shipping
Spares
Standards
Units per project
from a single locked firmware build
Firmware version
no over-the-air drift mid-project
Drops, staged
against your site programme, not one shipment
What moves the price
We quote per registered project, not from a public discount ladder. Two buyers enquiring about the same registered address get the same answer — one of them is told the project is taken.
| Credential mix | Usage pattern | Audit trail | Mounting | |
|---|---|---|---|---|
| Apartment buildings | PIN + card + app | Moderate per door, per day |
Per-unit log master-key hierarchy |
Standard mortise |
| Hotels & serviced | Card + time-limited PIN | Very high many cycles per day |
PMS integration checkout auto-revoke |
Standard mortise |
| Offices & co-working | App + card, per tenant | Moderate office hours |
Tenant segregation zone-level rights |
Glass door patch drill-free option |
| Rental & build-to-rent | App + temporary code | Moderate per tenancy cycle |
Handover log per tenancy cycle |
Standard mortise |
| Student housing | Card + PIN, offline fallback | High short, intense terms |
Batch revoke per intake |
Standard mortise |
| Next step | Request a quote | Request a quote | Request a quote | Request a quote |
← Swipe to compare →
Which Lock
A specification names a grade, not a model. These three correspond to the levels most project specifications actually land on — pick the grade first, then the model.
Residential unit doors at moderate cycle counts. The configuration that meets the specification without paying for capacity the building will never use.
Common areas, stair cores, plant rooms. Higher cycle counts and harder use, so the assembly and the finish are specified up — not the feature list.
Guest rooms where the lock is part of a property system: audit trail, time-limited credentials, checkout revoke, configured against your PMS.
Models in these families
| MODEL 1 ETV-C1 Commercial · mortise, heavy duty | MODEL 2 ETV-R7 Face + fingerprint · lever | MODEL 3 ETV-A2 ANSI lever · mortise, ANSI prep View product specs | MODEL 4 ETV-R1 Fingerprint entry · rim lever View product specs | |
|---|---|---|---|---|
| Family | 02 Heavy-duty | 03 Hospitality | 01 Entry grade | 01 Entry grade |
| Platform | Zigbee | Tuya | TT Lock | TT Lock |
| Rating | - | IP65 | - | IP54 |
| Why it is on this page | Common areas, stair cores and plant rooms. Zigbee where the building already runs a network the lock can join. | Guest rooms: contactless entry, audit trail and checkout revoke, configured against the property system. | Where the tender specifies an ANSI prep and the contractor does not want to re-cut a jig on site. | The unit-door SKU when the specification names no grade — cheap to repeat across a block, easy to hold spares for. |
| Next step | Request a quote | Request a quote | Request a quote | Request a quote |
← Swipe to compare →
Codes follow the factory designation; the version suffix is added at quotation. A blank rating means the model is not rated for exterior use. Reports are issued per model, so the code here is the code in the project file. Prices and minimums are quoted per registered project.
Bad Fit
Registration protects a site. Without one there is nothing to protect and no conflict to check — come back when the site exists.
Staged supply is the reason to use us. If the whole order lands at once, a distributor is the simpler and cheaper answer.
Payment terms are agreed per project and start from the first production run. We do not carry a project's cash flow.
Before you specify
Yes. Send the unit count, the door type and the credential mix, and you get a fixed quotation valid for the tender period. If the project is later re-scoped downward, the quoted tier still applies to the first drops.
We tell you that it is registered, and since when — without naming the other party or issuing a reference number. If you have a written relationship with the developer that predates the registration, we review both claims rather than defaulting to whoever registered first.
Yes — a reduced-price sample set, credited back against the first mass order if you win. We also supply the datasheet, the certificate pack and a dimensioned drawing suitable for a tender annex.
Deposit with order, balance against the bill of lading for the first order. From the second order onward we discuss partial release against each drop, which is usually what the project cash flow actually needs.
A diagnosis first, usually within a working day, then a replacement module by air. For large projects we hold a site-specific spare kit in the destination country where a partner warehouse exists.
Address, unit count, door type and handover date. We check for conflicts, and send back a protection letter and a locked quotation at your tier.
Conflict check on every registration · no fee to register